NP, can write something down.
String Freeze at Code Freeze 2010-09-21. We can accept fixes through RM
supervision this time with notification to the i18n/L10n list.
Default help documentation due 2010-11-05 (Code Freeze + 45 days).
Translations merges done 2011-01-28 (release - 30 days, back 2 days to
Friday). Availability of translations for merge may need planning
depending on resources for merging translations.
May, Megan Marie a écrit :
> FWIW, at the meeting the thought was not to distinguishing between indie/non-indie/kernel.
>
> As for string freeze, we acknowledged that it wasn't as early as we'd like but needed to be later for 2.8 if we're going to release by March 1. I'd like a little more elaboration on your -1. Can you tell us concrete dates for code freeze / string freeze / documentation / translation timing?
>
>
>
> -----Original Message-----
> From: sakai2-tcc-bounces at collab.sakaiproject.org [mailto:sakai2-tcc-bounces at collab.sakaiproject.org] On Behalf Of Jean-Francois Leveque
> Sent: Monday, August 23, 2010 4:51 AM
> To: sakai2-tcc at collab.sakaiproject.org
> Subject: Re: [sakai2-tcc] VOTE on 2.8 timeline (SHORTENED period)
>
> -1
>
> I still disagree with the code freeze / string freeze / documentation /
> translation timing.
>
> Think indies should be ready no later than the non-indie part.
>
> J-F
>
> Seth Theriault a écrit :
>> May, Megan Marie wrote:
>>
>>> The schedule for 2.8 release activity has been updated to
>>> reflect comments collected as well as the discussion from
>>> Wednesday.
>>>
>>> It is available at
>>> http://confluence.sakaiproject.org//x/8RkhB.
>>>
>>> I propose we vote to adopt this timeline.
>> The motion is seconded (by your chair) and is now OPEN for
>> voting. The vote will remain open until 23:59 UTC on Monday,
>> August 23, 2010.
>>
>> NOTE: In the interest of time and given the significant
>> previous discussion, the voting period is SHORTER than usual.
>>
>> As a reminder, this is a public, on-list vote with a "+1"
>> signifying "adoption of the 2.8 timeline as proposed."
>>
>> Per our governance documents, a -1 vote must be accompanied by
>> a detailed explanation. A single -1 vote based on a material
>> objection will block action. However, -1 blocking votes can be
>> overridden by a 2/3 majority roll call vote of active TCC
>> members.
>>
>> Seth
More information about the sakai2-tcc