[sakai2-tcc] Enhancement branch merge policy (end period) clarification

Beth Kirschner bkirschn at umich.edu
Thu May 26 12:52:02 PDT 2011


I've updated the documentation, trying to take everyone's comments into consideration. Please take a look at https://confluence.sakaiproject.org/display/TCC/Maintenance+Branch+Merge+Policy

- Beth

On May 23, 2011, at 10:03 AM, May, Megan Marie wrote:

> This sounds good to me.   
> 
> There hasn't been any objections to the refinements or alternate suggestions.  The spirit of the practice isn't changing so I don't believe that we need a formal vote on this.   
> 
> Would you update the confluence documentation?
> Megan
> 
> -----Original Message-----
> From: Beth Kirschner [mailto:bkirschn at umich.edu] 
> Sent: Friday, May 20, 2011 1:51 PM
> To: Jean-Francois Leveque
> Cc: May, Megan Marie; Matthew Jones; sakai2-tcc at collab.sakaiproject.org; DAVID ROLDAN MARTINEZ
> Subject: Re: [sakai2-tcc] Enhancement branch merge policy (end period) clarification
> 
> +1
> 
> On May 20, 2011, at 11:19 AM, Jean-Francois Leveque wrote:
> 
>> Megan,
>> 
>> I'm not Beth and my own vision was a bit blurred. ;)
>> 
>> I think the following order is worth trying:
>> 1) Criteria outline in JIRA
>> 2) 1st announcement to dev and production with cc to TCC
>> 3) 2nd announcement to dev and production with cc to TCC if all goes 
>> fine
>> 
>> WDYT?
>> 
>> J-F
>> 
>> On 20/05/2011 17:01, May, Megan Marie wrote:
>>> Beth,
>>>  What was your vision?
>>> 
>>> Megan
>>> 
>>> -----Original Message-----
>>> From: Jean-Francois Leveque [mailto:jean-francois.leveque at upmc.fr]
>>> Sent: Friday, May 20, 2011 8:42 AM
>>> To: May, Megan Marie
>>> Cc: Matthew Jones; Beth Kirschner; 
>>> sakai2-tcc at collab.sakaiproject.org; DAVID ROLDAN MARTINEZ
>>> Subject: Re: [sakai2-tcc] Enhancement branch merge policy (end 
>>> period) clarification
>>> 
>>> I thought the criteria outline was prepared and went to the TCC oversight before any announcement on other lists.
>>> 
>>> I think the process has to be more explicit regarding the order.
>>> 
>>> Do you mean CCing sakai2-tcc at collab.sakaiproject.org when sending to other lists will do as far as oversight is concerned?
>>> 
>>> +1 on JIRA criteria outline. If everyone is OK, this should be in the
>>> policy page.
>>> 
>>> J-F
>>> 
>>> On 19/05/2011 21:16, May, Megan Marie wrote:
>>>> It was my understanding that the announcement needed to be made to 
>>>> the community at large for comment. I think that it only went to the 
>>>> TCC list (which there are not a large number of lurkers).
>>>> 
>>>> My thoughts on how this should work are
>>>> 
>>>> *The JIRA should outline how the criteria is met
>>>> 
>>>> *The announcement should be sent to the community at large (which 
>>>> would also outline the above). I never thought about the wait time 
>>>> but I think
>>>> 1 week sounds fair
>>>> 
>>>> Right now my impression is that the TCC oversight is that we all are 
>>>> monitoring to ensure the above is happening and step in if things 
>>>> seemed to go awry during the trial period.
>>>> 
>>>> ~Me
>>>> 
>>>> *From:*sakai2-tcc-bounces at collab.sakaiproject.org
>>>> [mailto:sakai2-tcc-bounces at collab.sakaiproject.org] *On Behalf Of 
>>>> *Matthew Jones
>>>> *Sent:* Thursday, May 19, 2011 12:09 PM
>>>> *To:* Beth Kirschner
>>>> *Cc:* sakai2-tcc at collab.sakaiproject.org
>>>> *Subject:* [sakai2-tcc] Enhancement branch merge policy (end period) 
>>>> clarification
>>>> 
>>>> Hi Beth (and others),
>>>> 
>>>> A question came up about (enhancement) Branch Policy policy today 
>>>> [1] on the RM call and I don't remember if there was ever an answer 
>>>> to it. It's was regarding when the period for discussion is over and 
>>>> merging can be done. Since you drafted the proposal maybe you 
>>>> remember if there was an answer?
>>>> 
>>>> * Yesterday JFL floated the request to merge SAK-14625 to 2.7.x. 
>>>> (Add group section filter to dropbox) [2] Currently this has been 
>>>> met with silence which is okay based on the policy. But there's 
>>>> nothing that states how much time should pass before action can be 
>>>> taken to actually merge this. No formal vote or discussion is required based on the proposal.
>>>> 
>>>> But when should it get actually merged if there are no objections? 1 
>>>> week? By the next release management call? When TCC chair says 
>>>> "Since there were no objections to the request to merge SAK-14625 it 
>>>> shall be merged!" I don't really have a great opinion on this. 
>>>> Minimum 1 week from email then made official (in or out) at the next 
>>>> RM call seems like the best option to me? Many of us on the RM call are also on TCC.
>>>> 
>>>> I plan to write up one for annotated URL (SAK-19369) for the next 
>>>> 2.7 release as well. I think these 2 were the first so far? There 
>>>> might be a few more as we look to getting a 2.7.2 release out.
>>>> 
>>>> Thanks!
>>>> 
>>>> [1]
>>>> https://confluence.sakaiproject.org/display/TCC/Maintenance+Branch+M
>>>> erge+Policy 
>>>> <https://confluence.sakaiproject.org/display/TCC/Maintenance+Branch+
>>>> Merge+Policy>
>>>> 
>>>> 
>>>> [2] 
>>>> http://collab.sakaiproject.org/pipermail/sakai2-tcc/2011-May/001108.
>>>> html
>> 
>> 
>> --
>> Jean-François Lévêque
>> Responsable technique Sakai
>> Université Pierre et Marie Curie
>> 
>> --
>> Jean-Francois Leveque
>> Australe CTO (local Sakai CLE)
>> University Pierre and Marie Curie
>> France
>> 
>> 
> 
> 
> 



More information about the sakai2-tcc mailing list