[sakai2-tcc] Enhancement branch merge policy (end period) clarification

May, Megan Marie mmmay at indiana.edu
Thu May 19 12:16:25 PDT 2011


It was my understanding that the announcement needed to be made to the community at large for comment.  I think that it only went to the TCC list (which there are not a large number of lurkers).

My thoughts on how this should work are

*         The JIRA should outline how the criteria is met

*         The announcement should be sent to the community at large (which would also outline the above).   I never thought about the wait time but I think 1 week sounds fair

Right now my impression is that the TCC oversight is that we all are monitoring to ensure the above is happening and step in if things seemed to go awry during the trial period.
~Me

From: sakai2-tcc-bounces at collab.sakaiproject.org [mailto:sakai2-tcc-bounces at collab.sakaiproject.org] On Behalf Of Matthew Jones
Sent: Thursday, May 19, 2011 12:09 PM
To: Beth Kirschner
Cc: sakai2-tcc at collab.sakaiproject.org
Subject: [sakai2-tcc] Enhancement branch merge policy (end period) clarification

Hi Beth (and others),

A question came up about (enhancement) Branch Policy policy today [1] on the RM call and I don't remember if there was ever an answer to it. It's was regarding when the period for discussion is over and merging can be done. Since you drafted the proposal maybe you remember if there was an answer?

* Yesterday JFL floated the request to merge SAK-14625 to 2.7.x. (Add group section filter to dropbox) [2] Currently this has been met with silence which is okay based on the policy. But there's nothing that states how much time should pass before action can be taken to actually merge this. No formal vote or discussion is required based on the proposal.

But when should it get actually merged if there are no objections? 1 week? By the next release management call? When TCC chair says "Since there were no objections to the request to merge SAK-14625 it shall be merged!" I don't really have a great opinion on this. Minimum 1 week from email then made official (in or out) at the next RM call seems like the best option to me? Many of us on the RM call are also on TCC.

I plan to write up one for annotated URL (SAK-19369) for the next 2.7 release as well. I think these 2 were the first so far? There might be a few more as we look to getting a 2.7.2 release out.

Thanks!

[1] https://confluence.sakaiproject.org/display/TCC/Maintenance+Branch+Merge+Policy
[2] http://collab.sakaiproject.org/pipermail/sakai2-tcc/2011-May/001108.html
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://collab.sakaiproject.org/pipermail/sakai2-tcc/attachments/20110519/48f39d4e/attachment.html 


More information about the sakai2-tcc mailing list