There was a link to re-open it on the UI because it was past the stop and
due dates. But when I clicked on it, nothing happened, as it was still
waiting to hit the Viewable condition. There wasn't a link to close it
because it was already in the close state.
So I guess that is kind of the undefined state? You're really reopening a
"Viewable" eval not a "Closed" eval? And you can't Close it if you're
between the Grace period and Viewable. I'd be happy to either be able to
close it (completely viewable and all) or re-open it. ;) For instance these
2 I can't Re-open or Close. The Re-open link doesn't do anything and it
technically *is* closed. The workaround was to set the view date to *now*
so it can be re-opened.
[image: Inline image 1]
As far as #2, I don't think I have enough stones to throw at RSF.
On Mon, Apr 30, 2012 at 5:52 PM, Aaron Zeckoski <azeckoski at unicon.net>wrote:
> Matt,
> 1) That wouldn't be reopening a closed eval then. That would reopening
> an open eval. But in this case, a viewable and closed eval are both
> going to pass that check so that check would not stop the eval from
> being able to be reopened. I think you might have the wrong cause for
> your issue. There were other issues related to closed evals not being
> able to be reopened in 1.4.
>
> https://jira.sakaiproject.org/browse/EVALSYS-1230
> https://jira.sakaiproject.org/browse/EVALSYS-1135
>
>
> 2) Null dates are translated when the eval object is loaded from the
> database and converted into actual dates. That is the right way to
> handle this and populating the database with dates which will not be
> updated later if the option is turned back off could lead to some
> pretty ugly bugs.
> I think the real issue here is that something changed in the recent
> version of RSF or perhaps the date picker or some code related to it
> which means there are a few issues with dates and the way they are now
> processing (most notably around the fact that RSF seems to load the
> date data straight from the DB instead of using the values in the
> object and that it also saves the values directly back to the DB at
> the end of the request cycle even if the actual services were never
> called. This only happens with the dates so and not with other data on
> the page and I haven't had a chance to dig into it more but it seems
> like the right fix here is to drop the RSF date picker and use the
> jquery one which is being suggested for use by the rest of the Sakai
> community (kill 2 birds with one stone).
>
> -AZ
>
>
> On Mon, Apr 30, 2012 at 3:48 PM, Matthew Jones <matthew at longsight.com>
> wrote:
> > 1) We had an issue where an instructor couldn't re-open an evaluation
> that
> > was "apparently closed" come up. The problem was that it past the "due
> and
> > stop dates" but not yet viewable. (For another week, for whatever reason)
> >
> > In the code it has:
> >
> > // check if already active, do nothing if not closed
> > if (EvalUtils.checkStateAfter(currentEvalState,
> > EvalConstants.EVALUATION_STATE_CLOSED, false)) {
> >
> > However the state order is * States: Partial -> InQueue -> Active ->
> > GracePeriod -> Closed -> Viewable (-> Deleted)
> >
> > Does anyone else think that it should be "checkStateAfter
> > EVALUATION_STATE_GRACEPERIOD ", which would catch the closed and viewable
> > states?
> >
> > 2) In the administration interface you can set the option
> > " Use stop date (grace period) for evaluations, otherwise just use the
> due
> > date "
> >
> > If later you decide to remove this, all of the stop dates are "NULL" in
> the
> > database, and the UI looks kind of funky for displaying this field on
> > previous evaluations.
> >
> > It seems like it this is enabled either two things should happen.
> >
> > - The system should update the database and set all STOP_DATE values
> that
> > are NULL to be equal to the DUE_DATE.
> > - If the STOP_DATE is NULL and this option is selected, display the
> > DUE_DATE instead (instead of an empty area, incorrect date)
> >
> > I didn't want to file these as issues in-case there was a reason for
> them,
> > but would be happy to write them up.
> >
> > _______________________________________________
> > evaluation mailing list
> > evaluation at collab.sakaiproject.org
> > http://collab.sakaiproject.org/mailman/listinfo/evaluation
> >
> > TO UNSUBSCRIBE: send email to
> evaluation-unsubscribe at collab.sakaiproject.org
> > with a subject of "unsubscribe"
>
>
>
> --
> Aaron Zeckoski - Software Architect - http://tinyurl.com/azprofile
> _______________________________________________
> evaluation mailing list
> evaluation at collab.sakaiproject.org
> http://collab.sakaiproject.org/mailman/listinfo/evaluation
>
> TO UNSUBSCRIBE: send email to
> evaluation-unsubscribe at collab.sakaiproject.org with a subject of
> "unsubscribe"
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://collab.sakaiproject.org/pipermail/evaluation/attachments/20120430/534b2fb6/attachment-0001.html
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/png
Size: 7197 bytes
Desc: not available
Url : http://collab.sakaiproject.org/pipermail/evaluation/attachments/20120430/534b2fb6/attachment-0001.png
More information about the evaluation
mailing list